Planning for a future Murray River crossing at Swan Hill : community feedback summary report

This report summarises Transport for NSW’s consultation with the Swan Hill and Murray Downs community and stakeholders about the preferred alignment of a future Murray River crossing at Swan Hill. Between Monday 14 September and Friday 13 November 2020, Transport for NSW called for community feedback and comments about two options for the alignment of a future bridge in Swan Hill. These two options are: 1. Option 9a, located about 120 metres upstream (east) of the existing bridge, and 2. McCallum Street Option, located at the existing bridge alignment at McCallum Street. All feedback received has been reviewed and is summarised in this report to help inform future planning for a future bridge.

Data Source:
  • OpenGov
Data and Resources
Additional Information
Field Value
Title Planning for a future Murray River crossing at Swan Hill : community feedback summary report
Date Published 15/05/2021
Last Updated 15/05/2021
Publisher/Agency NSW Government
Licence Licence Specified by Agency
Data Portal OpenGov